Novati Constructions – Wharfside Manly
August 31, 2023
Pace Development Group Riverside
August 31, 2023
Novati Constructions – Wharfside Manly
August 31, 2023
Pace Development Group Riverside
August 31, 2023

Old Bar Ambulance Centre

Local solution for new Ambulance Centre

After years of relying on the Ambulance services from Taree, located 16k west, a new Ambulance Centre was designed for the coastal town of Old Bar, which is a popular tourist destination located on the northern coast of NSW.

In late 2022, Premier Steel was contacted by A W Edwards Port Macquarie office to design a Truedek Steel Deck for the proposed Centre, located on the main road into Old Bar.

Due to the sloping site and building design that included offices, mechanical areas and wash-bays for the ambulances, the building had to be elevated, so Truedek was selected for the suspended slab.

The final design by M+G Consulting Engineers was for Truedek TD140 panels and Infill to be installed on piers, with unpropped spans of between 4m and 6.4m, in both full Truss and Truss/Pan/Truss configurations as the most cost-effective solution for the building.

The majority of the 610m2 building slab was specified by the Engineers as a voided option, enabling a concrete saving of up to 30%.

Premier Steel Technologies